< Back to projects

Crane Lift of Stair Tower

Client: Bovis Lend Lease
Site: Royal North Shore Hospital - St Leonards

Description: Bovis Lend Lease were faced with the very common construction site problem of a stair tower being an obstruction during a concrete pour. PC Scaffolding came up with a solution which only the Allround system can facilitate. PC Scaffolding simply lifted the stair tower by the on-site tower crane into a new location where it would not be an obstruction and then placed it back again when required. This saved Bovis Lend Lease both time and money as they did not have to allow for penetration holes or other such costly practices to get around this problem.